dong Nupidong 1 -

4.2 Nupindong (Buffalo cave 1)
Zone 48 - 654602 2742303 Alt 944m
Survey contains 41 survey stations, joined by 40 shots.
There are 0 loops.
Total length of survey shots = 1244.20m (1244.20m adjusted)
Total plan length of survey shots = 1234.60m
Total vertical length of survey shots = 51.75m
Vertical range = 23.76m (from upin_dong.c6 at 958.71m to upin_dong.c10 at 934.95m)
North-South range = 871.63m (from upin_dong.c11 at 2742305.58m to upin_dong.a2 at 2741433.94m)
East-West range = 166.82m (from upin_dong.a1 at 654678.11m to upin_dong.a29 at 654511.29m)
1-nodes (qty 2)
2-nodes (qty 39)
A river through cave.

AUT. VAR. Collated by GED CAMPION (2001)
The YRC Guangxi Caves 2000 Expedition. The YRC Bulletin Summer 2001 64 p., 45 photos, 4 cartes, 8 topographies
Analyse : gkc-JPB
Résultat des explorations menéees au cours de l’expédition Guangxi Caves 2000 dans la province du Guangxi (Comtés de Leye et Lingyun).

621 caractères - Lu 100 Fois




Recherche